Munich - Amperverband

Cambi's first SolidStream plant was installed in the AmperVerband wastewater treatment plant (WWTP) in 2015. The Solidstream configuration treats sludge after digestion but retains impressive results for dewaterability, volume reduction, sterility, and biogas production. The plant was fully commissioned during 2015 and formally taken over by Amperverband at the end of 2016.