CambiTHP at Oslo EGE - Romerike biogas plant

Oslo - Romerike Biogassanlegg

Country: Norway

Client: Municipality of Oslo

Solution: CambiTHP - B12

Oslo - Romerike Biogas Plant

After fierce international competition, Cambi won the contract to deliver a turnkey biowaste plant for the city of Oslo in 2013. This breakthrough contract was awarded by Oslo's Energy Recycling Agency, otherwise known as "Energigjenvinningsetaten" (EGE).  

The plant is designed to treat 15,000 dry tonnes/yr of source-sorted waste from households combined with industrial biowaste. The waste is converted to biogas and biofertiliser. The biogas is further refined into methane and liquified for use in transport, mainly for public buses in Oslo. 

A map snippet of the plant location

CambiTHP - B12
EQUIPMENT

CambiTHP B12

B12 thermal hydrolysis model
Thermal hydrolysis before anaerobic digestion
EQUIPMENT

THP before anaerobic digestion

Thermal hydrolysis before anaerobic digestion

Drammen

Cambi thermal hydrolysis plant in Norway, delivered to Lindum, in operation since 2012.
Aerial phot of Lillestroem

Lillestrøm - Krogstad Miljøpark

Cambi's eighth thermal hydrolysis plant in Norway, to be delivered to the municipality of Lillestrøm, near Oslo
CambiTHP - Verdal Ecopro, Norway

Verdal - Ecopro

Cambi thermal hydrolysis plant (co-digestion) in Norway, operating for Ecopro since 2008.
CambiTHP at Mjøsanlegget Glor plant, Norway

Lillehammer - Mjøsanlegget

Cambi thermal hydrolysis plant for biowaste delivered to Glør. In operation since 2001, fully refurbished in 2016.
CambiTHP - Stavanger Grødaland, Norway

Stavanger - Grødaland

Cambi thermal hydrolysis plant in Norway, delivered to IVAR, in operation since 2014