London - Crossness

Country: United Kingdom

Client: Thames Water

Solution: CambiTHP - B12

Crossness

Located on the south bank of the river Thames, the Crossness sewage treatment works (STW) was first connected to the London Sewer network in 1850. Today is serves a population of 2 million people and is one of the largest treatment works in the UK. Nearly opposite on the north bank Crossness STW serves 3.5 million people.

The chosen method is to pre-treat the secondary sludge with Cambi thermal hydrolysis and anaerobic digest it before making agricultural grade fertilizer. The upside of this process is that significant renewable energy can be made as well as a safe product for recycling. Initially Thames Water chose to divert some sludge from Beckton to its Riverside plant via an existing pipeline and use the Cambi Digestion process in digesters at that site- this project is complete.

As a further stage to providing sludge treatment capacity, Thames has awarded a project to Imtech Process for refurbishment of existing digesters at the Beckton Crossness sites to treat mainly secondary sludge so that the incinerators will use maily primary sludge that dewaters well and has high energy content. The works incorporates refurbishing 6 digesters at both sites, adding Cambi THP systems reactors and 4 MWs of combined heat and power that only provides some electricity for operations of the STW but also a large amount of the heat required to drive the thermal hydrolysis process.

 

 

A map snippet of the plant location

CambiTHP - B12
EQUIPMENT

CambiTHP B12

B12 thermal hydrolysis model
Thermal hydrolysis before anaerobic digestion
EQUIPMENT

THP before anaerobic digestion

Thermal hydrolysis before anaerobic digestion
CambiTHP - Basingstoke UK 1

Basingstoke

Cambi thermal hydrolysis plant in Basingstoke, in operation since 2018. Operated by Thames Water.
Cambi HP - Birmingham Minworth UK

Birmingham - Minworth

Cambi thermal hydrolysis plant in Birmingham, UK in operation since 2018. Operated by Severn Trent.
CambiTHP - Chertsey plant, UK

Chertsey

Cambi's first thermal hydrolysis plant in England, delivered to Thames Water, in operation since 1999.
CambiTHP - Seafield plant, Ireland

Edinburgh - Seafield

Cambi thermal hydrolysis plant in Scotland, delivered to Scottish Water, in operation (by Veolia) since 2002.
CambiTHP - Davyhulme plant, UK

Manchester - Davyhulme

Cambi thermal hydrolysis plant in England, delivered to United Utilities, in operation since 2013. Functions as sludge centre for the Manchester area.
CambiTHP - Middlesbrough Bran Sands 1

Middlesborough - Bran Sands

Cambi thermal hydrolysis plant in Middlesborough, UK in operation since 2008. Operated by Northumbrian Water.