CambiTHP at Jurong plant, Singapore

Singapore - Jurong

Country: Singapore

Client: PUB

Solution: CambiTHP - B6

Jurong

The Jurong WRP, owned and operated by the Public Utilities Board (PUB), is located in west Singapore. The plant treats industrial and municipal wastewater. 

PUB chose to install a Cambi thermal hydrolysis system to process waste activated sludge (WAS), which is pre-treated together with fats, oil, and grease, and then cooled through tube-in-tube coolers before being sent to the digesters and dewatered by centrifuge. 

Cambi supplied a B6 unit as well as the digester coolers. The system can be expanded to allow for future capacity requirements. 

 

A map snippet of the plant location

CambiTHP - B6
EQUIPMENT

CambiTHP B6

B6 thermal hydrolysis model
Thermal hydrolysis before anaerobic digestion
EQUIPMENT

THP before anaerobic digestion

Thermal hydrolysis before anaerobic digestion