CambiTHP - Clinton River, Medina, OH

Medina - Kenneth W. Hotz

Country: USA

Client: Medina County

Solution: CambiTHP - B2

Medina - Kenneth W. Hotz

The Kenneth W. Hotz Water Reclamation Facility in Medina, Ohio, improved its solids treatment system utilizing new, advanced technologies to provide energy savings and other sustainable beneļ¬ts. The plant features a Cambi thermal hydrolysis process system as pretreatment applied before anaerobic digestion.

The unit was delivered to the project site fully assembled, which minimised time and work for installation and start-up at the site. By using Cambi's thermal hydrolysis process, the treated solids meet the highest U.S. Environmental Protection Agency (EPA) criteria for land application as Class A fertiliser.

A map snippet of the plant location

CambiTHP - B2
EQUIPMENT

CambiTHP B2

B2 thermal hydrolysis model
Thermal hydrolysis before anaerobic digestion
EQUIPMENT

THP before anaerobic digestion

Thermal hydrolysis before anaerobic digestion
CambiTHP plant - Washington DC Piscataway US

Washington DC - Piscataway

Cambi thermal hydrolysis plant in Washington DC. It will be delivered to the Washington Suburban Sanitary Commission in 2022.
CambiTHP - Washington DC Blue Plains, US

Washington DC - Blue Plains

Cambi thermal hydrolysis plant in Washington DC, delivered to DC Water, in operation since 2014.
Dallas TRA 1.jpg

Dallas - TRA CRWS

Cambi thermal hydrolysis plant in Texas. To be delivered to the Trinity River Authority in 2021
CambiTHP - Pontiac Auburn US

Pontiac - Clinton River

Cambi thermal hydrolysis plant in Pontiac, Michigan. Delivered to Oakland County Water Resources Commissioner in 2019.
CambiTHP - Hampton Roads US

Virginia Beach - Atlantic

Cambi thermal hydrolysis plant in Virginia Beach, Virginia. Delivered to Hampton Roads Sanitation District (HRSD) in 2020.
WWTP

Franklin

Cambi thermal hydrolysis plant in Franklin, Tennessee, USA. To be commissioned in 2021.
CambiTHP - Raleigh, USA

Raleigh - Neuse River

Cambi thermal hydrolysis plant in Raleigh, North Carolina. It will be delivered to the City of Raleigh Public Utilities Department in 2021.
CambiTHP plant in Kansas City

Kansas City - Blue River

First Cambi thermal hydrolysis plant in Missouri, US. To be delivered to the city of Kansas in 2024.