CambiTHP at Dartford Long Reach UK

Dartford - Long Reach

Country: United Kingdom

Client: Thames Water

Solution: CambiTHP - B6

Dartford - Long Reach

Discharging into the River Thames, the Long Reach Sewage Treatment Works is crucial to the ongoing effort to revive and preserve the river. Cambi commissioned a thermal hydrolysis process unit for the Thames Water facility in 2015. 

The site currently uses its biosolids product for agricultural applications.  

 

A map snippet of the plant location

CambiTHP - B6
EQUIPMENT

CambiTHP B6

B6 thermal hydrolysis model
Thermal hydrolysis before anaerobic digestion
EQUIPMENT

THP before anaerobic digestion

Thermal hydrolysis before anaerobic digestion
CambiTHP - Basingstoke UK 1

Basingstoke

Cambi thermal hydrolysis plant in Basingstoke, in operation since 2018. Operated by Thames Water.
Cambi HP - Birmingham Minworth UK

Birmingham - Minworth

Cambi thermal hydrolysis plant in Birmingham, UK in operation since 2018. Operated by Severn Trent.
CambiTHP - Chertsey plant, UK

Chertsey

Cambi's first thermal hydrolysis plant in England, delivered to Thames Water, in operation since 1999.
CambiTHP - Seafield plant, Ireland

Edinburgh - Seafield

Cambi thermal hydrolysis plant in Scotland, delivered to Scottish Water, in operation (by Veolia) since 2002.
CambiTHP - Davyhulme plant, UK

Manchester - Davyhulme

Cambi thermal hydrolysis plant in England, delivered to United Utilities, in operation since 2013. Functions as sludge centre for the Manchester area.
CambiTHP - Middlesbrough Bran Sands 1

Middlesborough - Bran Sands

Cambi thermal hydrolysis plant in Middlesborough, UK in operation since 2008. Operated by Northumbrian Water.