CambiTHP at  Huaifang 3

Beijing - Huaifang

Country: China

Client: Beijing Drainage Group

Solution: CambiTHP - B12

Huaifang Water Reclamation Plant

Asia's largest underground advanced wastewater treatment facility, the Huaifang Water Reclamation Plant (WRP) was built in 2016 as part of Beijing's wastewater action plan.

The plant uses thermal hydrolysis to optimize biogas production, generating 18.8 million kilowatt-hours of electricity annually and producing pathogen-free biosolids.

Huaifang is one of five Cambi projects in Beijing. Fill out the form on this page to download the plant factsheet and learn more about this well-renowned facility.

 

 

 

A map snippet of the plant location

CambiTHP - B12
EQUIPMENT

CambiTHP B12

B12 thermal hydrolysis model
Thermal hydrolysis before anaerobic digestion
EQUIPMENT

THP before anaerobic digestion

Thermal hydrolysis before anaerobic digestion
CambiTHP at Xiaohongmen plant, Beijing

Beijing - Xiaohongmen

Cambi thermal hydrolysis plant in Beijing, China in operation since 2017. Operated by Beijing Drainage Group.
CambiTHP at Gaobeidian - Beijing, China

Beijing - Gaobeidian

Cambi thermal hydrolysis plant in Beijing, China in operation since 2017. Operated by Beijing Drainage Group.
CambiTHP at Qing He II

Beijing - Qinghe II

Cambi thermal hydrolysis plant in Beijing, China in operation since 2020. Operated by Beijing Drainage Group.
CambiTHP at Gaoantun 2

Beijing - Gaoantun

Cambi thermal hydrolysis plant in Beijing, China in operation since 2017. Operated by Beijing Drainage Group.
Chongqing.png

Chongqing - Luoqi Food Waste Treatment Plant

Cambi thermal hydrolysis plant in Chongqing, China. Turned over to the Chongqing Sanitation and Environment Group in 2022.
Hong Kong skyline

Hong Kong - Shek Wu Hui

Cambi thermal hydrolysis plant in Hong Kong. It will be commissioned in 2024